St Mary’s Catholic Voluntary Academy

Growing minds, naturally

The first school in the UK built to meet the Department of Education GenZero specification, following passive design principles to minimise energy use.

A sweeping site adjacent to the World Heritage Site of Darley Abbey Mills, St Mary’s Catholic Voluntary grounds learning in nature.

We placed the five buildings along a central canopy, with dedicated blocks for each age group, amenity blocks for learning resources, and an entrance building for pupils and teachers to come together.

Comfortable spaces with great air quality and flooded with daylight make sure that the students have healthy learning environments, fostering learning, well-being, and attainment.

Each classroom is open to the outdoors, encouraging young explorers to connect with the natural landscape across the threshold.

I am so delighted for the children, staff, parents and wider community as we begin the next chapter in the new St Mary’s, the greenest school in the UK. It has been an absolute privilege to be part of this incredible pathway project.

Guided by biophilia, we invested in landscaping and the views towards it with full-height glazing, so every learning space is connected visually and physically to the changing seasons outside. Meanwhile, wildflower meadows planted on the roofs will fill the school site with wildlife.

Natural materials were used wherever possible. We chose timber for the cladding and frame to store carbon and contribute to the natural aesthetic – the vibrant red cedar cladding will gradually silver with time – while ensuring fire safety standards.

By embracing Modern Methods of Construction (MMC) with SIPs (Structurally Insulated Panels) systems, the design achieved low carbon targets, quick and high-quality delivery, and minimal construction waste.

The low embodied carbon – far below the target set by the RIBA 2030 Climate Challenge – is paired with rooftop solar panels to meet 100% of the school’s energy requirements throughout its future.

Project details

Project name: St Mary’s Catholic Voluntary Academy

Location: Derby, UK

Value: < £20M

Scope: Architecture

Clients: The Department for Education, UK

Status: Live

Completion date: 2023

Principal contractors: Tilbury Douglas Construction

Landscape architects: Ares Landscape Architects

Planning consultants: Dha

MEP engineers: Cundall

Structural engineers: Adept Engineering

Fire engineers: OFR Fire Engineer

Environmental consultants: ADAS

Acoustic consultants: Mach Acoustics

Awards

AJ100 Award 2024
Sustainability Initiative of the Year - Winner

Structural Timber Awards 2024
Education Project of the Year - Winner